MINUTES
LITCHFIELD SCHOOL BUILDING COMMITTEE
LITCHFIELD
INTERMEDIATE SCHOOL LIBRARY
A
meeting of the Litchfield School Building Committee was held on
Present
were: Jack Healy, Chairman; Stacie Kavle, Mac Bramley; Gary Waugh; Jeff Zullo
and Robert Blazek.
Also
Present: John Tindall-Gibson;
Meeting
was called to order at
Approval
of Minutes
Motion
to approval the minutes of the
Corrections:
Page
5, Line 5 – Mac Bramley stated “On the stub
outs, will there be a system that will cut off irrigation if there is a fire at
LIS? Also, they need the fence up before out project starts. Problem.”
Page
5, Line 14 – Mac Bramley asked “Is there pedestrian
access from
Motion
Carried. All votes were in the
affirmative. There were no abstentions.
Public
Participation
Leo
Paul – Met with DEP and they asked if the BC had looked into green design and
grant funding.
Jack
Healy – HSNP incorporated green design in the new construction.
Stacie
Kavle – To some degree the design has to be further along
to start looking at green design. It is
not inexpensive.
Jeff
Zullo – We should definitely pursue it with the
design committee. Evaluate green design
and green grants.
Mac
Bramley – When we initially talked about this the
Town was considering hiring a grant writer.
There are a number of sites online where educational grants are
available.
Jeff
Zullo – It is the Architect’s responsibility to
initiate this. Detailed design in done next week, we should initiate this with
them.
Stacie
Kavle – If we as a committee make a formal request of
HSNP to look into green design, they will look further into it.
Communication
John
Tindall-Gibson passed out a report from the BOE Facilities Committee on the
auditorium stage.
Gary
Waugh read the following Resolution of Support confirming its confidence in the
Building Committee:
The Litchfield Board of Education
unequivocally reconfirms its confidence in the
Even with dramatic rises in the costs of
construction, which would have affected any building committee with similar
pressures and difficult choices, our Committee has been both creative and
responsible; holding the line on the project’s ultimate costs, ensuring that
the promised levels of reimbursement are secured, all the while providing a
plan that will meet the education specifications submitted by the Board of
Education. Whey this concept was offered
to the voters of Litchfield it passed by an almost three to one margin. This was a clear demonstration of the
community will and we believe that position remains unchanged.
We do not believe that further delay or
major concept discussions are called for or are even permitted under our grant
from the State of
We are steadfast and unanimous in our
support of this project and this Building Committee.
Gary
Waugh – The BOE asked how they want us to proceed in interacting with them on
the technology. They are talking about a
slight variation in wiring.
Jeff
Zullo – The BOF is supportive in everything the BC is
doing.
Stacie
Kavle – I received a report from the Kitchen
Consultant and Education Connection. They
felt we should do more work at the LHS Kitchen than is planned. We are going to put there suggestions in
design development as an add alternate.
John
Tindall-Gibson – I had a letter that points out code violations and
inadequacies. My concern is that it puts
in writing possible hazards and presents a liability.
Mac
Bramley – Are we obligated to make it code compliant.
Jeff
Zullo – Education Connection is a subcontractor for
food service. Are they responsible for
equipment?
Finance
Subcommittee Report
Mac
Bramley – I convened and hallway and immediately
adjourned for lack of a quorum. We will
have presentations for bill payment for HSNP at the next Building Committee
meeting. We also need to talk about the
funds for fences. Could we allocate a
portion of our bonding to the Town?
Jeff
Zullo – Because time is of the essence there is no
way to manage it through our project. We
should allocate the money to the Playing Fields Group.
Mac
Bramley – If the bond counsel will agree to that, the
resolution we passed is general in scope.
Jack
Healy – We can not make a decision without having talked to all the appropriate
parties, including David Wedge and bond counsel.
Mac
Bramley – We should change it in the budget to an add item and delete it immediately.
Jack
Healy – We can not make a decision tonight.
We need to go back to do our homework.
Mac
Bramley – Can the existing contractor come up with an
estimate on the length and different materials?
Jack
Healy – Regardless of the cost of the fence, this committee is committed to
$75K.
Stacie
Kavle – Why do the fences have to go up right away?
Jeff
Zullo – You don’t want people to have access with
cars, or bikes in that area. Damage and
a liability issue. I’ll contact David
Wedge and discuss this.
Gary
Waugh – It is critical when the track is laid down that there is no delay
putting the fence up. Once the work is
done the money has to be in place to pay for it.
Technology
Update
Mac
Bramley – Has there been a discussion on distance
learning where Litchfield is a provider instead of a receiver?
Playing
Fields Group
Jeff
Zullo – The project has stopped because of the
weather. The issues with sedimentation
and runoff are being remediated. The DEP is working with the Town and the
Wetlands to fix the problem. Hopefully
we’ll have grass growing this spring.
Motion
to Adjourn was made by Jeff Zullo at
Motion
Carried. All Votes were in the affirmative.
There were no abstentions.
Respectfully
Submitted,
Kelli
L. Green
Recorder